Project: BobCollins   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Bob Collins   -  
Project:   Vans - RV-12iS   -   VIEW REPORTS
Total Hours:1055
Total Expense:$101645.34
Start/Last Date:Jan 04, 2017 - No Finish Date
Engine:Rotax 912iS
Propeller:Sensenich
Panel:Dual screen G3X, autopilot
 
Friendly URL: https://eaabuilderslog.org?s=BobCollins

Home or Last Project Picture

Sep 13, 2020     Bonded NACA vent to top cowling - (1.5 hours)       Category: Finishing
I cut out the NACA vent which is installed on the top cowling and cools the electronic fuse box on the firewall as near as I can tell.

It's basically the same process as with the cooling fins.

I checked to be sure it doesn't interfere with the fusebox/voltage regulator (plenty of clearance), drilled holes, sanded and cleaned the area to be bonded, then mixed up some epoxy and flox and stuck it in place.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.